OPEN & RECENT REQUESTS FOR PROPOSALS, BIDS, QUALIFICATIONS
Posting Date | Project Number | Project Name | Closing Date | Addendums | Addtnl Details | Q & A | Tabulations | Awardee |
---|---|---|---|---|---|---|---|---|
3/8/24 | 24BB1001 | Outside Plant Install-Coroner, Brewery, Whiskey Mill | 3/20/24 | The District is interested in receiving informal quotations for OUTSIDE PLANT INSTALLATION-CORONER, BREWERY, WHISKEY MILL. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications. | ||||
2/23/24 | 24WTR1001 | Lead Service Line Inventory-Water | 3/8/24 | Addendum No. 1 | The District is interested in receiving informal quotations for LEAD SERVICE LINE INVENTORY. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications. Quotations must be received by 3 p.m., Friday, March 8, 2024, to be considered. Late arriving, incomplete bids will not be considered and will not be accepted. | Addendum No. 1 | ||
12/28/23 | 23BB1003 | Olympic Corridor & InBetween PON B Splicing | 1/10/24 | Addendum No. 1 | The District is interested in receiving informal quotations for Olympic Fiber Corridor and In-Between Pon B Splicing. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications. Quotations must be received by 3 p.m., Wednesday, January 10, 2024, to be considered. Late arriving, incomplete bids will not be considered and will not be accepted. | Q & A | Bid Tab | Precision Fiber |
12/20/23 | 23BB0803 | Olympic Corridor & InBetween Fiber Construction | 1/31/24 | Addendum No. 1 | Sealed bids will be received by the PUD No. 1 of Jefferson County, located at 310 Four Corners Rd., Port Townsend, WA 98368, until 3 p.m. Pacific Time, January 31, 2024, for the general contract for construction of broadband fiber construction in the District’s Olympic Corridor. Bidder shall provide a hard copy of all documents to be submitted in the bid package. In addition, the Bidder shall also include a USB memory stick with a copy of their bid in electronic searchable PDF format. The Unit Pricing Table within the Bid Proposal Form shall be in the original Excel Spreadsheet file structure. For questions related to this bid please contact Karen Abbott at 360-379-5824 or via email at kabbott@jeffpud.org. Bid documents can be found on the Builder's Exchange website at www.bxwa.com. | Q & A | North Sky Communications, LLC | |
7/17/23 | 2023-F/EOP002 | Quilcene Substation Bore | 8/8/23 | The Public Utility District No.1 of Jefferson County (PUD) is seeking bids for the Quilcene Substation Bore. The process of responding to the Bid should involve interested companies reviewing and analyzing the information provided herein and responding in writing to items where a response is requested. Direct all questions pertaining to the bid to Operations Director Scott A. Bancroft at sbancroft@jeffpud.org | Bid Tab | D&L Poles, Inc. | ||
6/26/23 | 23BB1002 | Quilcene Fiber Hut Electric Work | Extended Date 7/12/23 | Addendum No. 1 | The District is interested in receiving informal quotations for electrical work on the Quilcene Fiber Hut construction project. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications | Bid Tab | Double D Electric, Inc. | |
6/26/23 | 23BB1001 | Quilcene Fiber Hut Civil Work | Extended Date 7/12/23 | Addendum No. 1 | The District is interested in receiving informal quotations for civil work to prepare site and install new fiberglass hut on the Quilcene Substation property. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications. | Bid Tab | 2 Grade, LLC | |
5/26/23 | 2023-002 | Quilcene Substation Transformer | extended date: 7/26/2023 15:00:00 | Addendum No. 001 | Sealed proposals are to be delivered to:Attention: Alyson Dean, Purchasing AgentJefferson County PUD310 Four Corners RoadPort Townsend, WA 98368 | Bid Tab | Virginia Transformer | |
4/26/23 | 23BB0802 | BB Feeder-Distribution-Drop Material | 5/17/23 | Sealed bids will be received by JEFFERSON COUNTY PUBLIC UTILITY DISTRICT NO. 1, on or before 2:30 p.m. Wednesday, May 17, 2023. If mailed, to its office at 310 Four Corners Road, Port Townsend, WA 98368, Attn: Karen Abbott, Broadband Administrative Assistant. | Eval Results | Wesco Anixter | ||
3/29/23 | 23BB0801 | Outdoor Network Enclosures | 4/19/2023 14:30:00 | Sealed bids will be received by JEFFERSON COUNTY PUBLIC UTILITY DISTRICT NO. 1, on or before 2:30 p.m. Wednesday, April 19, 2023. If mailed, to its office at 310 Four Corners Road, Port Townsend, WA 98368, Attn: Karen Abbott, Broadband Administrative Assistant. | no bids submitted at deadline. | |||
3/15/23 | 23BB0501 | 3/29/2023 15:00:00 | RFP for Carrier Grade Network Address Translation (CGNAT) Systems are due on or before 3:00 p.m., March 29, 2023. | NetElastic | ||||
9/27/22 | 2022-007 | 10/13/2022 15:00:00 | Interested firms should submit proposals no later than 3:00pm on October 13, 2022. To: Kara Rogers Jefferson County Public Utility District No. 1, 310 Four Corners Road Port Townsend, WA 98368 Email submittals are accepted and should be sent to krogers@jeffpud.org | |||||
9/27/22 | 2022-006 | On-Call Cultural Resources | 10/19/2022 15:00:00 | On-Call Cultural Resources Advertisement Document Addendum Document RFQ 2022-006 Map Send to: Attn: Kara Rogers 310 Four Corners Road Port Townsend, WA 98368 Email submittals are accepted and should be sent to: krogers@jeffpud.org | Willamette Cultural Resources Associates | |||
9/14/22 | CAP 0012023 | Operations Rooftop Solar | 10/19/2022 15:00:00 | A mandatory bidder's site meeting will be held on September 28, 2022 at 10:00am at the PUD Operations Center located at 310 Four Corners Road. Questions developed from the mandatory bidder’s site meeting shall be presented in writing for a response by the PUD. The response is to be addressed as follows: Jefferson County PUD Operations Center Rooftop Solar Project (RFP) 310 Four Corners Road Port Townsend, WA 98368 CAP 0012023 Closing: 3:00:00pm PST, October 19, 2022. Attn: Scott Bancroft Inquiries shall be submitted via email or phone call to Scott Bancroft at sbancroft@jeffpud.org or 360-385-8363 | Cascadia Solar | |||
4/28/22 | 2022-005 | 5/12/2022 15:00:00 | Send to: | |||||
4/7/22 | 2022-004 | 4/20/2022 15:00:00 | Send to: Attention: Alyson Dean, Purchasing Agent | |||||
2/11/22 | 2022-003 | 3/9/2022 15:00:00 | Live Zoom Q&A Session was held on Thurs Feb. 24, 9AM. Link to Questions and Answers Addendum #1 to RFP | Finley Engineering | ||||
1/19/22 | 2022-002 | Fiber Optic Hand Holes | 2/2/2022 15:00:00 | Sealed Bids should be mailed to: Jefferson County PUD Bids may also be emailed to: adean@jeffpud.org | ||||
1/4/22 | 2022-001 | ON CALL ENGINEERING | 2/25/2022 15:00:00 | PUD No. 1 of Jefferson County, Attn: Kara Rogers, 310 Four Corners Road, Port Townsend, WA 98368 Email submittals are accepted and should be sent to:krogers@jeffpud.org. | HDR, Inc. | |||
12/12/21 | 2021-010 | Distribution System Transformers | 1/19/2022 15:00:00 | Sealed Proposals should be mailed to: Jefferson County PUD PDF copies of bid documents or links to a file containing the PDF copy should be sent to adean@jeffpud.org | ||||
11/3/21 | 2021-008 | 12/17/2021 15:00:00 | Q&A | Vision Metering | ||||
10/27/21 | 2021-006 | 11/17/2021 15:00:00 | Q&A | Calix |
Cost of Service Studies
FCS GROUP 2020-2021 Cost of Service Study Final Report November 2021:
Water, Sewer and Electric Rate Study & Pole Attachments
Presentation 1: Rate Setting Fundamentals
Presentation 2: Revenue Requirements
Presentation 3: Revenue Requirements Results
Presentation 4: Cost of Service Updates
Presentation 5: Pole Attachment Fees and December 2020 Updates
Presentation 6: February 2021 Updates
Presentation 7: April 2021 Rate Hearing
Presentation 8: May 2021 Updates
Previous Cost of Service Assessments
Cost of Service Rate Study – Final 1-16-2017
Rate Workshop Presentation 8-24-2016
Rate Workshop Presentation and Handouts 3-21-2016
Rate Design Presentation May 2015
Jefferson PUD COSA Report Draft 10-09-14
Jefferson PUD COSA 2014 Exhibits
Previous Pole Attachment Studies
JPUD Pole Attachment Final Report 12-01-14
JPUD Pole Attachment Exhibits 12-01-14
FSC Group Pole Attachments Study 2020
Water System Studies
Jeff-Co-PUD-OWSI-Acquisition-Feasibility-Study
Quilcene School District Consolidation Study
2019 Water Use Efficiency Draft Goals
Quilcene Water Tank Engineering Design 2020
Broadband/Telecom
2019 Broadband Strategic Plan (Magellan)
2021 Broadband Business Plan (CCG)
Broadband Planning Page
Telecommunications Workshop, August 9, 2016
OLDER STUDIES
Facilities
JPUD-Interim-Report-to-Board-2017-08-24.pdf
JPUD-Draft-Budgets-Alternative-1-2017-07-26.pdf
JPUD-Draft-Budgets-Alternative-2-2017-07-26.pdf
Rendering of JPUD Four Corners Compound Master Plan Buildout
Energy Efficiency Program
Energy Efficiency Incentives Program Presentation, April 11, 2016
Customer Survey 2015 Results
Survey Presentation
Re-analysis of 2015 Customer Survey by Stan Nealy, PhD
WPUDA Comms Presentation
JPUD Communications Presentation Feb 18, 2016