Jefferson County PUD maintains a Small Works Roster for various projects up to $350,000.
This is in accordance with the laws of the State of Washington and pursuant to the Revised Code of Washington (RCW) 39.04.155, which municipalities or special purpose districts may utilize for public works projects in their jurisdiction.
The Small Works Roster shall include contractors who are registered or licensed for general and/or specialty contract work. Small Works categories may be selected by completing the Small Works Roster Application linked below.
The applicant is hereby notified that all Washington State laws regarding prevailing wages and non-discrimination are applicable to ALL small works roster contract activities. All work is subject to Washington State Prevailing Wage. Download the WA State Statement of Intent to Pay Prevailing Wages form.
Small Works Application
Year | Date | Contractor | Project Description | Amount | Award Location |
---|---|---|---|---|---|
2018-09-17 | Bernt Ericsen Excavating Inc. | Tyler Undergrounding Project set conduit and vaults in the back of Tyler Street for undergrounding 936,930,926 Water Street. | $5,540.00 | Special Projects Coordinators office. | |
2018-11-05 | Bruch and Bruch Construction | Move 65’-80’ foot utility poles from 310 Four Corners to 210 Four Corners Pole yard. | $2,000.00 | Special Projects Coordinators office | |
2018-09-21 | Kemp West Inc. | Tree Trim all overhead conductor on East Quilcene and Lindsay Hill Road. | $89,380.00 | Special Projects Coordinators office | |
2018-11-19 | Shold Excavating Inc. | Operations Center Trenching and conduit Installation. Trench and install conduit for electrical and fiber, waterline, and sewer line to the new 3-Wide modular at 310 Four Corners Road. | $17,635.00 | Special Projects Coordinators office | |
2018-10-05 | Shold Excavating Inc. | Polk Street Trenching and Conduit Project is to trench at the back of Polk Street to add 3-phase and 1-phase transformers for undergrounding 215,213,211 Polk Street, 1102, 1136 Water Street. | $23,925.50 | Special Projects Coordinators office | |
2018-07-03 | Shold Excavating Inc. | Trench conduit, new transformers and vaults to rebuild underground primary lines. | $165,005.00 | Special Projects Coordinators office | |
2018-08-08 | Shold Excavating Inc. | Relocate utilities, water, power, fiber for 310 Four Corners Road. Includes trenching vaults and transformers. | $31,560.00 | Special Projects Coordinators office | |
2018-07-30 | Michels Corp. | Rebuild Irondale Substation | $1,117,327.34 | Special Projects Coordinators office | |
2018-05-18 | Shold Excavating Inc. | Cut and patch asphalt trench 620’ lay conduit install 3 fiber vaults and 2 575 LA vaults | $69,138.70 | Special Projects Coordinators office | |
2019-02-05 | Coon Plumbing | Plumb the 3-Wide modular located at 310 Four Corners Road. | $1,825.98 | PUD website and Special Projects Coordinators office | |
2019-01-16 | Shold Excavating Inc. | Excavate trench install conduit cut Van Ness Road. | $10,267.80 | PUD website and Special Projects Coordinators office | |
2019-05-16 | Shold Excavating Inc. | Cut across Water Street from existing vaults on North Side to Elevated Ice Cream on South side. | $16,677.00 | PUD website and Special Projects Coordinators office | |
2019-03-28 | Shold Excavating Inc. | Back of Tyler Street tin in project to link unknown quantiy of existing conduit into vaults. | $25,413.35 | PUD website and Special Projects Coordinators office | |
2019-09-30 | Shold Excavating Inc. | Install underground conduit 1200 feet on Lemonds Drive. | $25,157.20 | PUD website and Special Projects Coordinators office | |
2019-01-14 | Seton Construction | Quincy Street undergrounding completion project. Install conduit and two vaults on Quincy Street | $14,709.55 | PUD website and Special Projects Coordinators office | |
2019-07-19 | Shold Excavating Inc. | Trench and install underground conduit at the undeveloped section of Howard Street | $42,466.40 | PUD website and Special Projects Coordinators office | |
2019-09-30 | Shold Excavating Inc. | Undergroound for loop feed at E Sims Way in Port Townsend | $46,870.00 | PUD website and Special Projects Coordinators office | |
2019-09-18 | Shold Excavating Inc. | Trench and install conduit. Install two pencell vaults pad mount transformer back of Polk Street | $21,950.00 | PUD website and Special Projects Coordinators office | |
2019-07-01 | Shold Excavating Inc. | Prep site at 210 Four Corners Road for 3-wide modular. | $7,891.00 | PUD website and Special Projects Coordinators office | |
2019-05-17 | Shold Excavating Inc. | Install temporary wateline for Kilisut Harbor. WSDOT franchise agreement | $73,139.00 | PUD website and Special Projects Coordinators office | |
2019-10-16 | Shold Excavating Inc. | Excavate Trench in COPT ROW ti install underground conduit. | $17,919.60 | PUD website and Special Projects Coordinators office | |
2019-12-20 | Shold Excavating Inc. | Excavate trench install conduit and vaults on Enfield Street. | $14,235.40 | PUD website and Special Projects Coordinators office | |
2019-09-30 | Kemp West | Tree trim Dabob Post Office Road | $23,295.00 | PUD website and Special Projects Coordinators office | |
2019-08-01 | Kemp West | Lords Lake/Leland Valley Tree Trimming Project | $57,740.00 | PUD website and Special Projects Coordinators office | |
2019-09-19 | Kemp West | Tree Trim HWY 101 at Discovery Bay and Eaglemount Road | $118,120.00 | PUD website and Special Projects Coordinators office | |
2019-12-13 | Kemp West | Tree Trim West Valley Road | $71,550.00 | PUD website and Special Projects Coordinators office | |
2019-07-23 | Asplundh | Tree trim Snow Creek/ Leland Valley E/ Walch Ranch | $67,725.00 | PUD website and Special Projects Coordinators office | |
2019-07-09 | Asplundh | S Discovery Tree Trim Project | $60,725.00 | PUD website and Special Projects Coordinators office | |
2019-11-20 | Asplundh | Tree Trim South of Quilcene | $53,270.82 | PUD website and Special Projects Coordinators office | |
2019-03-24 | Asplundh | Tree trim 1.3 miles of HWY 101 near Crocker Lake | $29,750.00 | PUD website and Special Projects Coordinators office | |
2019-10-16 | Asplundh | Tree trim Quilcene area from Bowen Street to Lords Lake Loop | $39,313.20 | PUD website and Special Projects Coordinators office | |
2019-03-05 | Fredrickson Electric | Convery OH to UG on back of Tyler Street. | $13,553.06 | PUD website and Special Projects Coordinators office | |
2019-02-04 | Fredrickson Electric | Connect conduit and install circuit from junction box to connex | $2,459.00 | PUD website and Special Projects Coordinators office | |
2019-01-28 | Fredrickson Electric | Conex power and receptacle Project. Install power to onsite connex. | $6,965.00 | PUD website and Special Projects Coordinators office | |
2019-03-01 | Seton Construction | Kala Point Bluff Drive Trenching and Conduit Project. | $51,251.80 | PUD website and Special Projects Coordinators office | |
2019-11-06 | CHJ and Son Excavating | Safeway Store conduit and vault installation project. Upgrade electrical to Safeway | $106,235.76 | PUD website and Special Projects Coordinators office | |
2019-05-16 | Shold Excavating Inc. | Cut across Water Street from existing vaults on North Side to Elevated Ice Cream on South side. | $16,677.00 | PUD website and Special Projects Coordinators office | |
2019-02-25 | Seton Construction Inc. | Convert OH to UG on S Discovery Road. This project was a franchise agreement with the Jefferson County Public Works to move S Discovery Road. | $39,562.50 | PUD website and Special Projects Coordinators office | |
2019-04-25 | Bernt Ericsen Excavating Inc. | Visitor Center undergrounding project, converted OH to UG between Washington Street and Jefferson Street in Port Townsend. | $85,336.10 | PUD website and Special Projects Coordinators office | |
2019-01-25 | Double DD Electric Inc. | Power installation to 3-wide modular at 310 Four Corners Road. | $8,665.00 | PUD website and Special Projects Coordinators office | |
2019-02-05 | Coon Plumbing | Plumb the 3-Wide modular located at 310 Four Corners Road. | $1,825.98 | PUD website and Special Projects Coordinators office | |
2020-01-03 | Landmark Excavating | Trench and lay conduit at the White Building in COPT | $11,231.79 | PUD website and Special Projects Coordinators office. | |
2020-01-10 | Shold Excavating | Trench and lay conuit along Adams Street | $89,380.00 | PUD website and Special Projects Coordinators office. | |
2020-01-10 | Kemp West | Tree trimming at the end of Coyle | $67,090.00 | PUD website and Special Projects Coordinators office. | |
2020-01-10 | Shold Excavating | Remove sidewalk trench install conduits and vaults | $18,551.80 | PUD website and Special Projects Coordinators office. | |
2020-03-19 | Seton Construction | Upgrade underground electrical at Pincrest Drive in Kala Point | $231,117.06 | PUD website and Special Projects Coordinators office. | |
2020-02-11 | Asplundh Tree Expert | Coyle Phase 3 Tree Trimming Project | $115,088.00 | PUD website and Projects Managers office. | |
2020-04-27 | Shold Excavating | Port of Port Townsend Airport Project | $87,494.30 | PUD website and Projects Managers office. | |
2020-05-01 | Wildflower Landscaping | Substation Lawn Mowing Project | $5,781.36 | PUD website and Projects Managers office. | |
2020-03-17 | Magnum Power | Hilda Street Bore and Sims Way Bore | $138,500.00 | PUD website and Projects Managers office. | |
2020-04-09 | Gardens at Port Townsend | PUD Tree Screening Project | $8,415.00 | PUD website and Projects Managers office. | |
2020-03-19 | Seton Construction | Pinecrest Drive Underground Upgrade Project | $231,117.06 | PUD website and Projects Managers office. | |
2020-02-07 | Asplundh Tree Expert | Coyle Phase 2 Tree Trimming Project | $59,680.00 | PUD website and Projects Managers office. | |
2020-06-05 | Asplundh Tree Expert | Transmission Line Clearing Fairmount, Eaglemount and Rhody | $70,471.58 | PUD website and Projects Managers office. | |
2020-06-05 | Shold Excavating | Trench and lay conduit along Swansonville Road | $104,640.00 | PUD website and Projects Managers office. | |
2020-09-03 | Shold Excavating | Elkins Primary Extension Project | $113,687.00 | PUD website and Project Managers office. | |
2020-09-16 | Van Aller Surveying | Shine Plat Water Design | $14,920.00 | PUD website and Project Managers office. | |
2020-09-03 | Asplundh Tree Expert | October to December Time and Materials Project | $114,004.80 | PUD website and Proejct Managers office. | |
2020-08-13 | 2-Grade LLC | Hastings Substation Ground and COnduit Trenching | $14,205.97 | PUD website and Project Managers office. | |
2020-08-13 | Tacoma Pump and Drilling CO. INC. | Reynolds Well Surface Seal Replacement Project | $12,807.50 | PUD website and Project Managers office. | |
2020-09-22 | L and J Excavating Inc. | Reynolds Well Cleanup Project | $10,355.00 | PUD website and Project Managers office. | |
2020-06-25 | Hoch Construction | Pumphouse Reconditioning Project | $7,287.74 | PUD website and Project Managers office. | |
2020-10-30 | Carl H Johnson and Son Excavating | Clay Street to Jefferson Street Conduit Installation | $29,286.12 | PUD website and Project Managers office. | |
2020-10-05 | Potelco Inc. | Transmission Line Fiber Installation | $144,391.01 | PUD website and Project Managers office. | |
2020-10-01 | D and L Poles | Port of Port Townsend Electrical Upgrade | $25,287.25 | PUD website and Project Managers office. | |
2020-11-25 | Shold Excavating | Jackman Street Conduit and Vault Installation | $26,579.65 | PUD website and Operations Managers office | |
2020-11-25 | Shold Excavating | Kala Point | $45,583.80 | PUD website and Operations Managers office | |
2021-01-01 | Asplundh Tree Expert LLC | Tree Trimming T and M, Various Locations in Jefferson County. Work January 1, 2021 to February 26, 2021 | $75,769.60 | PUD Website and Operations Managers office. | |
2021-01-12 | CHJ and Son Excavating | 300 Four Corners Road Demolition Project. Remove buildings located at 300 Four Corners Rd. | $45,405.04 | PUD Website and Operations Managers office. | |
2021-01-14 | 2 Grade Excavating | SR 101 Bridge Project Electrical Bypass Project | $35,038.05 | PUD Websitew and Operations Director office | |
2021-02-09 | Lakeside Industries | Jefferson County PUD Asphalt Project. | $22,345.00 | PUD Website and Operations Director office | |
2021-02-02 | Titan FB | Electrical Dock Work | $21,959.00 | PUD Website and Operations Director office | |
2021-02-25 | D and L Poles | Waterside Mowing Project. Mow PUD septic drainfield areas. This is a 2-year contract | $43,600 | PUD Website and Operations Director office | |
2021-02-25 | Shold Excavating Inc. | Quilcene School Electrical Upgrade Project. Underground a 260 foot span of OH conductor. | $8,965.25 | PUD Website and Operations Director office | |
2021-02-25 | D and L Poles | Switchyard Silt Removal and Gravel Replacement Project. | $7,366.22 | PUD Website and Operations Director office | |
2021-02-25 | 2-Grade LLC | Kala Point Baycliff to Kala Point Drive Undergrounding Project | $84,848.33 | PUD Website and Operations Director office | |
2021-02-25 | 2-Grade LLC | Phase Three Electrical Upgrade Project for Port of PT | $56,042.35 | PUD Website and Operations Director office | |
2021-02-25 | Kemp West | SR Tree Trimming Project. Trim and remove trees in various locations of SR | $57,420.00 | PUD Website and Operations Director office | |
2021-03-17 | Nisbet Timber Inc. | Peterson Lake Timber Sale | 55% PUD 45% to contractor of proceeds of timber sale. | ||
2021-03-17 | Seton Construction | Snow Creek Well House Replacement | 189,655.07 | PUD Website and Operations Directors office. | |
2021-04-19 | Big Blue Pressure Washing and Lawn | Substation Lawn Mowing Project | $4,909.50 | PUD Website and Operations Directors office. | |
2021-04-14 | Kemp West Inc. | Transmission Line Clearing 2021 Project | $94,800.00 | PUD Website and Operations Directors office. | |
2021-04-20 | Shold Excavating Inc. | 210 Four Corners Road Stormwater Mitigation Project | $19,157.96 | PUD Website and Operations Directors office. | |
2021-07-07 | Titan FB | PUD/WSDOT North Tribiutary Franchise Project. Bore along SR101. | $79,250.43 | PUD Website and Operations Directors office. | |
2021-07-20 | D and L Poles | Golf Course Electrcial Upgrade | $52,500 | PUD Website and Operations Directors office. | |
2021-05-24 | Kemp West | Tree trim and removal of trees along Hazel Point Road and Johnson Road. | $32,510.00 | PUD Website and Operations Directors office. | |
2021-07-25 | Hoch Construction | Install ADA compliant door at Operations Center | $27,811.77 | PUD Website and Operations Directors office. | |
2021-08-20 | Titan FB | Install utility poles along the PUD owned transmission line. | $38,185.00 | PUD Website and Operations Directors office. | |
2021-03-19 | Tracy's Insulation | Insulate new connex container. | $5,359.84 | PUD Website and Operations Directors office. | |
2021-03-10 | Sound Earth Strategies | Provide soils and ground water evaluation on parcel 001333013 | $8,425.00 | PUD Website and Operations Directors office. | |
2021-04-29 | D and L Poles | Hoh Fiber Project part 2. Plow fiber from SR101 to Hoh Tribal Buildings. | $36,712.15 | PUD Website and Operations Directors office. | |
2021-05-04 | Magnum Power | Hoh Fiber Project part 1. Pull fiber into existing UG conduit, install eight spans OH fiber. | $20,947.20 | PUD Website and Operations Directors office. | |
2021-06-02 | Kemp West | Brush Hog with mini excavator. Ground clear under PUD owned OH electrical conductor. | $5,500.00 | PUD Website and Operations Directors office. | |
2021-10-27 | Asplundh Tree Expert LLC. | November to December Time and Materials Bid 2021 | $94,644.00 | PUD Website and Operations Directors office. | |
2021-12-08 | IDGAF Inc | Van Trojen Road Electrical Upgrade Phase 1. This project was bid out late 2021 this is a 2022 project. | $54,052.50 | PUD Website and Operations Directors office. | |
2021-12-08 | IDGAF Inc. | Rhododendron Drive Electrical Undergrounding. This project was bid out late 2021 this is a 2022 project | $61,260.00 | PUD Websit and Operations Directors office | |
2021-12-08 | Kemp West | Gardiner Tree Trimming Bid. This project is bid out late 2021 project begins January 6, 2022. | $108,270.00 | PUD Website and Operations Directors office. | |
2021-12-08 | D and L Poles | Thorndyke Driveway Project. This project is bid out late 2021 project begins 2022. | $50,500.00 | PUD Website and Operations Directors office. | |
2021-12-06 | IDGAF Inc. | Eaglemount Road Tree Clearing Project | $26,296.95 | PUD Website and Operations Directors office. | |
2022-03-03 | D and L Poles | PUD Ground Clearing 2022 Project | $27,493.20 | PUD Website and Operations Directors office. | |
2022-03-03 | D and L Poles | PUD Port of Port Townsend Marina Electrical Upgrade Project. | $46,000.00 | PUD Website and Operations Directors office. | |
2022-03-03 | Fredrickson Electric | 191 Otto Street Lighting Project | $39,868.41 | PUD Website and Operations Directors office. | |
2022-02-04 | Kemp West | Dabob/Thorndyke Road Tree Trimming Bid | $128,300.00 | PUD Website and Operations Directors office. | |
2022-03-28 | IDGAF | 300 Four Corners Temporary Laydown Yard | $66,136.42 | PUD Website and Operations Directors office. | |
2022-08-08 | D and L Poles | On Call Water Services Bid | $337.00 per hour | PUD Website and Operations Directors office. | |
2022-08-08 | Asplundh Tree Expert LLC | October to December Time and Materials Project 2022 | $123,531.20 | PUD Website and Operations Directors office. | |
2022-10-12 | CHJ and Son Excavating | Van Trojen Road Conduit Realignment Project. | $13,813.15 | PUD Website and Operations Directors office. | |
2022-09-19 | IDGAF Inc. | Oak Bay Regulator Trenching and Pad Project | $23,652.33 | PUD Website and Operations Directors office. | |
2022-10-12 | Peterson Lake Timber Sale 2023 Work to be conducted in 2023. | PUD Website and Operations Directors office. | |||
2022-02-03 | CHJ Excavating Inc. | Irondale Substation Electrical/Fiber Upgrade Project | $53,336.81 | PUD Website and Operations Directors office. | |
2022-05-04 | D and L Poles | 14th Street Underground Project | $41,458.00 | PUD Website and Operations Directors office. | |
2022-04-10 | ICI Inc. | Cedar Avenue Project | $168,352.21 | PUD Website and Operations Directors office. | |
2022-11-22 | Pacific Poles | PUD Utility Pole Testing for 2023. Work will begin in 2023. Cost of $209.19 is cost if all testing options are used. | $209.19 per pole | PUD Website and Operations Directors office. | |
2022-11-22 | Cascadia Solar | Install solar PV system on PUD Operations Center at 310 Four Corners Road. This project bid out in 2022 for work to be conducted in 2023 | $239,052.00 | PUD Website and Operations Directors office. | |
2022-10-10 | D and L Poles | Loftus Road Electrical Upgrade Project | $13,092.00 | PUD Website and Operations Directors office. | |
2022-01-01 | Palouse Power | Dock Crew 2022 Bid for four man crew per hour. | $815.38 | PUD Website and Operations Directors office. | |
2022-01-13 | Olympic Electric | PUD BPA to Irondale Substation Fiber Installation | $79,792.79 | PUD Website and Operations Directors office. | |
2022-01-03 | Cooperative Response Center | CRC 24-Hour Call Service Charged on a per call basis invoiced per month. | $5,000.00 per mo | PUD Website and Operations Directors office. | |
2023-02-07 | Katies Cleaning Service | Clean PUD owned buildings at 310 Four Corners, 210 Four Corners, and 191 Otto Street contract for one year with option to extend | $2,500.00 per mo | PUD Website and Operations Directors office. | |
2023-01-03 | Asplundh Tree Expert | Janaury to March Time and Materials 2023 Project. | $128,747.52 | PUD Website and Operations Directors office. | |
2023-01-16 | Palouse Power | Electrical Dock Crew ELCON-2023-01 Palouse overall grade for the project was 254 | $2,730,090.00 | PUD Website and Operations Directors office. | |
2023-02-23 | Kemp West | PUD Tree Trimming/Removal Time and Materials Bid Summer 2023 | $196,978.10 | PUD Website and Operations Directors office. | |
2023-08-09 | D and L Poles | PUD East Quilcene Road Bridge Crossing | $52,368.00 | PUD Website and Operations Directors office. | |
2023-05-09 | Northwest Safety LLC | Monthly Safety Training Contract | $17,325.00 | PUD Website and Operations Directors office. | |
2023-06-05 | Magnum Power LLC | Oak Bat to Washington Lane | $96,651.69 | PUD Website and Operations Directors office. | |
2023-06-27 | Daniel Anderson Trucking | Flagging Support for PUD 2023 | $164,548.33 | PUD Website and Operations Directors office. | |
2023-07-03 | Daniel Anderson Trucking | Flagging Summer 2023 | $75,056.44 | PUD Website and Operations Directors office. | |
2023-05-01 | Oasis Well Drilling | Gardiner Source Pump and Motor Replacement Project | $29,989.41 | PUD Website and Operations Directors office. | |
2023-07-07 | Wright Tree Service | Fiber Electric Tree Trimming Summer 2023 Time and Materials | $189,949.50 | PUD Website and Operations Directors office. | |
2023-04-12 | Kemp West | Tree Trimming/Removals Cape George Road. Work to begin January 2, 2024 approximate end date of March 8, 2024 | $142,704.47 | ||
2023-07-12 | Asplundh Tree Expert | February to May 2024 Time and Materials. Work to begin February 2, 2024 and end May 31, 2024. | $194,509.24 |