Previously Awarded Projects
| Year | Date | Contractor | Project Description | Amount | Award Location |
|---|---|---|---|---|---|
| 2018-09-17 | Bernt Ericsen Excavating Inc. | Tyler Undergrounding Project set conduit and vaults in the back of Tyler Street for undergrounding 936,930,926 Water Street. | $5,540.00 | Special Projects Coordinators office. | |
| 2018-11-05 | Bruch and Bruch Construction | Move 65’-80’ foot utility poles from 310 Four Corners to 210 Four Corners Pole yard. | $2,000.00 | Special Projects Coordinators office | |
| 2018-09-21 | Kemp West Inc. | Tree Trim all overhead conductor on East Quilcene and Lindsay Hill Road. | $89,380.00 | Special Projects Coordinators office | |
| 2018-11-19 | Shold Excavating Inc. | Operations Center Trenching and conduit Installation. Trench and install conduit for electrical and fiber, waterline, and sewer line to the new 3-Wide modular at 310 Four Corners Road. | $17,635.00 | Special Projects Coordinators office | |
| 2018-10-05 | Shold Excavating Inc. | Polk Street Trenching and Conduit Project is to trench at the back of Polk Street to add 3-phase and 1-phase transformers for undergrounding 215,213,211 Polk Street, 1102, 1136 Water Street. | $23,925.50 | Special Projects Coordinators office | |
| 2018-07-03 | Shold Excavating Inc. | Trench conduit, new transformers and vaults to rebuild underground primary lines. | $165,005.00 | Special Projects Coordinators office | |
| 2018-08-08 | Shold Excavating Inc. | Relocate utilities, water, power, fiber for 310 Four Corners Road. Includes trenching vaults and transformers. | $31,560.00 | Special Projects Coordinators office | |
| 2018-07-30 | Michels Corp. | Rebuild Irondale Substation | $1,117,327.34 | Special Projects Coordinators office | |
| 2018-05-18 | Shold Excavating Inc. | Cut and patch asphalt trench 620’ lay conduit install 3 fiber vaults and 2 575 LA vaults | $69,138.70 | Special Projects Coordinators office | |
| 2019-02-05 | Coon Plumbing | Plumb the 3-Wide modular located at 310 Four Corners Road. | $1,825.98 | PUD website and Special Projects Coordinators office | |
| 2019-01-16 | Shold Excavating Inc. | Excavate trench install conduit cut Van Ness Road. | $10,267.80 | PUD website and Special Projects Coordinators office | |
| 2019-05-16 | Shold Excavating Inc. | Cut across Water Street from existing vaults on North Side to Elevated Ice Cream on South side. | $16,677.00 | PUD website and Special Projects Coordinators office | |
| 2019-03-28 | Shold Excavating Inc. | Back of Tyler Street tin in project to link unknown quantiy of existing conduit into vaults. | $25,413.35 | PUD website and Special Projects Coordinators office | |
| 2019-09-30 | Shold Excavating Inc. | Install underground conduit 1200 feet on Lemonds Drive. | $25,157.20 | PUD website and Special Projects Coordinators office | |
| 2019-01-14 | Seton Construction | Quincy Street undergrounding completion project. Install conduit and two vaults on Quincy Street | $14,709.55 | PUD website and Special Projects Coordinators office | |
| 2019-07-19 | Shold Excavating Inc. | Trench and install underground conduit at the undeveloped section of Howard Street | $42,466.40 | PUD website and Special Projects Coordinators office | |
| 2019-09-30 | Shold Excavating Inc. | Undergroound for loop feed at E Sims Way in Port Townsend | $46,870.00 | PUD website and Special Projects Coordinators office | |
| 2019-09-18 | Shold Excavating Inc. | Trench and install conduit. Install two pencell vaults pad mount transformer back of Polk Street | $21,950.00 | PUD website and Special Projects Coordinators office | |
| 2019-07-01 | Shold Excavating Inc. | Prep site at 210 Four Corners Road for 3-wide modular. | $7,891.00 | PUD website and Special Projects Coordinators office | |
| 2019-05-17 | Shold Excavating Inc. | Install temporary wateline for Kilisut Harbor. WSDOT franchise agreement | $73,139.00 | PUD website and Special Projects Coordinators office | |
| 2019-10-16 | Shold Excavating Inc. | Excavate Trench in COPT ROW ti install underground conduit. | $17,919.60 | PUD website and Special Projects Coordinators office | |
| 2019-12-20 | Shold Excavating Inc. | Excavate trench install conduit and vaults on Enfield Street. | $14,235.40 | PUD website and Special Projects Coordinators office | |
| 2019-09-30 | Kemp West | Tree trim Dabob Post Office Road | $23,295.00 | PUD website and Special Projects Coordinators office | |
| 2019-08-01 | Kemp West | Lords Lake/Leland Valley Tree Trimming Project | $57,740.00 | PUD website and Special Projects Coordinators office | |
| 2019-09-19 | Kemp West | Tree Trim HWY 101 at Discovery Bay and Eaglemount Road | $118,120.00 | PUD website and Special Projects Coordinators office | |
| 2019-12-13 | Kemp West | Tree Trim West Valley Road | $71,550.00 | PUD website and Special Projects Coordinators office | |
| 2019-07-23 | Asplundh | Tree trim Snow Creek/ Leland Valley E/ Walch Ranch | $67,725.00 | PUD website and Special Projects Coordinators office | |
| 2019-07-09 | Asplundh | S Discovery Tree Trim Project | $60,725.00 | PUD website and Special Projects Coordinators office | |
| 2019-11-20 | Asplundh | Tree Trim South of Quilcene | $53,270.82 | PUD website and Special Projects Coordinators office | |
| 2019-03-24 | Asplundh | Tree trim 1.3 miles of HWY 101 near Crocker Lake | $29,750.00 | PUD website and Special Projects Coordinators office | |
| 2019-10-16 | Asplundh | Tree trim Quilcene area from Bowen Street to Lords Lake Loop | $39,313.20 | PUD website and Special Projects Coordinators office | |
| 2019-03-05 | Fredrickson Electric | Convery OH to UG on back of Tyler Street. | $13,553.06 | PUD website and Special Projects Coordinators office | |
| 2019-02-04 | Fredrickson Electric | Connect conduit and install circuit from junction box to connex | $2,459.00 | PUD website and Special Projects Coordinators office | |
| 2019-01-28 | Fredrickson Electric | Conex power and receptacle Project. Install power to onsite connex. | $6,965.00 | PUD website and Special Projects Coordinators office | |
| 2019-03-01 | Seton Construction | Kala Point Bluff Drive Trenching and Conduit Project. | $51,251.80 | PUD website and Special Projects Coordinators office | |
| 2019-11-06 | CHJ and Son Excavating | Safeway Store conduit and vault installation project. Upgrade electrical to Safeway | $106,235.76 | PUD website and Special Projects Coordinators office | |
| 2019-05-16 | Shold Excavating Inc. | Cut across Water Street from existing vaults on North Side to Elevated Ice Cream on South side. | $16,677.00 | PUD website and Special Projects Coordinators office | |
| 2019-02-25 | Seton Construction Inc. | Convert OH to UG on S Discovery Road. This project was a franchise agreement with the Jefferson County Public Works to move S Discovery Road. | $39,562.50 | PUD website and Special Projects Coordinators office | |
| 2019-04-25 | Bernt Ericsen Excavating Inc. | Visitor Center undergrounding project, converted OH to UG between Washington Street and Jefferson Street in Port Townsend. | $85,336.10 | PUD website and Special Projects Coordinators office | |
| 2019-01-25 | Double DD Electric Inc. | Power installation to 3-wide modular at 310 Four Corners Road. | $8,665.00 | PUD website and Special Projects Coordinators office | |
| 2019-02-05 | Coon Plumbing | Plumb the 3-Wide modular located at 310 Four Corners Road. | $1,825.98 | PUD website and Special Projects Coordinators office | |
| 2020-01-03 | Landmark Excavating | Trench and lay conduit at the White Building in COPT | $11,231.79 | PUD website and Special Projects Coordinators office. | |
| 2020-01-10 | Shold Excavating | Trench and lay conuit along Adams Street | $89,380.00 | PUD website and Special Projects Coordinators office. | |
| 2020-01-10 | Kemp West | Tree trimming at the end of Coyle | $67,090.00 | PUD website and Special Projects Coordinators office. | |
| 2020-01-10 | Shold Excavating | Remove sidewalk trench install conduits and vaults | $18,551.80 | PUD website and Special Projects Coordinators office. | |
| 2020-03-19 | Seton Construction | Upgrade underground electrical at Pincrest Drive in Kala Point | $231,117.06 | PUD website and Special Projects Coordinators office. | |
| 2020-02-11 | Asplundh Tree Expert | Coyle Phase 3 Tree Trimming Project | $115,088.00 | PUD website and Projects Managers office. | |
| 2020-04-27 | Shold Excavating | Port of Port Townsend Airport Project | $87,494.30 | PUD website and Projects Managers office. | |
| 2020-05-01 | Wildflower Landscaping | Substation Lawn Mowing Project | $5,781.36 | PUD website and Projects Managers office. | |
| 2020-03-17 | Magnum Power | Hilda Street Bore and Sims Way Bore | $138,500.00 | PUD website and Projects Managers office. | |
| 2020-04-09 | Gardens at Port Townsend | PUD Tree Screening Project | $8,415.00 | PUD website and Projects Managers office. | |
| 2020-03-19 | Seton Construction | Pinecrest Drive Underground Upgrade Project | $231,117.06 | PUD website and Projects Managers office. | |
| 2020-02-07 | Asplundh Tree Expert | Coyle Phase 2 Tree Trimming Project | $59,680.00 | PUD website and Projects Managers office. | |
| 2020-06-05 | Asplundh Tree Expert | Transmission Line Clearing Fairmount, Eaglemount and Rhody | $70,471.58 | PUD website and Projects Managers office. | |
| 2020-06-05 | Shold Excavating | Trench and lay conduit along Swansonville Road | $104,640.00 | PUD website and Projects Managers office. | |
| 2020-09-03 | Shold Excavating | Elkins Primary Extension Project | $113,687.00 | PUD website and Project Managers office. | |
| 2020-09-16 | Van Aller Surveying | Shine Plat Water Design | $14,920.00 | PUD website and Project Managers office. | |
| 2020-09-03 | Asplundh Tree Expert | October to December Time and Materials Project | $114,004.80 | PUD website and Proejct Managers office. | |
| 2020-08-13 | 2-Grade LLC | Hastings Substation Ground and COnduit Trenching | $14,205.97 | PUD website and Project Managers office. | |
| 2020-08-13 | Tacoma Pump and Drilling CO. INC. | Reynolds Well Surface Seal Replacement Project | $12,807.50 | PUD website and Project Managers office. | |
| 2020-09-22 | L and J Excavating Inc. | Reynolds Well Cleanup Project | $10,355.00 | PUD website and Project Managers office. | |
| 2020-06-25 | Hoch Construction | Pumphouse Reconditioning Project | $7,287.74 | PUD website and Project Managers office. | |
| 2020-10-30 | Carl H Johnson and Son Excavating | Clay Street to Jefferson Street Conduit Installation | $29,286.12 | PUD website and Project Managers office. | |
| 2020-10-05 | Potelco Inc. | Transmission Line Fiber Installation | $144,391.01 | PUD website and Project Managers office. | |
| 2020-10-01 | D and L Poles | Port of Port Townsend Electrical Upgrade | $25,287.25 | PUD website and Project Managers office. | |
| 2020-11-25 | Shold Excavating | Jackman Street Conduit and Vault Installation | $26,579.65 | PUD website and Operations Managers office | |
| 2020-11-25 | Shold Excavating | Kala Point | $45,583.80 | PUD website and Operations Managers office | |
| 2021-01-01 | Asplundh Tree Expert LLC | Tree Trimming T and M, Various Locations in Jefferson County. Work January 1, 2021 to February 26, 2021 | $75,769.60 | PUD Website and Operations Managers office. | |
| 2021-01-12 | CHJ and Son Excavating | 300 Four Corners Road Demolition Project. Remove buildings located at 300 Four Corners Rd. | $45,405.04 | PUD Website and Operations Managers office. | |
| 2021-01-14 | 2 Grade Excavating | SR 101 Bridge Project Electrical Bypass Project | $35,038.05 | PUD Websitew and Operations Director office | |
| 2021-02-09 | Lakeside Industries | Jefferson County PUD Asphalt Project. | $22,345.00 | PUD Website and Operations Director office | |
| 2021-02-02 | Titan FB | Electrical Dock Work | $21,959.00 | PUD Website and Operations Director office | |
| 2021-02-25 | D and L Poles | Waterside Mowing Project. Mow PUD septic drainfield areas. This is a 2-year contract | $43,600 | PUD Website and Operations Director office | |
| 2021-02-25 | Shold Excavating Inc. | Quilcene School Electrical Upgrade Project. Underground a 260 foot span of OH conductor. | $8,965.25 | PUD Website and Operations Director office | |
| 2021-02-25 | D and L Poles | Switchyard Silt Removal and Gravel Replacement Project. | $7,366.22 | PUD Website and Operations Director office | |
| 2021-02-25 | 2-Grade LLC | Kala Point Baycliff to Kala Point Drive Undergrounding Project | $84,848.33 | PUD Website and Operations Director office | |
| 2021-02-25 | 2-Grade LLC | Phase Three Electrical Upgrade Project for Port of PT | $56,042.35 | PUD Website and Operations Director office | |
| 2021-02-25 | Kemp West | SR Tree Trimming Project. Trim and remove trees in various locations of SR | $57,420.00 | PUD Website and Operations Director office | |
| 2021-03-17 | Nisbet Timber Inc. | Peterson Lake Timber Sale | 55% PUD 45% to contractor of proceeds of timber sale. | ||
| 2021-03-17 | Seton Construction | Snow Creek Well House Replacement | 189,655.07 | PUD Website and Operations Directors office. | |
| 2021-04-19 | Big Blue Pressure Washing and Lawn | Substation Lawn Mowing Project | $4,909.50 | PUD Website and Operations Directors office. | |
| 2021-04-14 | Kemp West Inc. | Transmission Line Clearing 2021 Project | $94,800.00 | PUD Website and Operations Directors office. | |
| 2021-04-20 | Shold Excavating Inc. | 210 Four Corners Road Stormwater Mitigation Project | $19,157.96 | PUD Website and Operations Directors office. | |
| 2021-07-07 | Titan FB | PUD/WSDOT North Tribiutary Franchise Project. Bore along SR101. | $79,250.43 | PUD Website and Operations Directors office. | |
| 2021-07-20 | D and L Poles | Golf Course Electrcial Upgrade | $52,500 | PUD Website and Operations Directors office. | |
| 2021-05-24 | Kemp West | Tree trim and removal of trees along Hazel Point Road and Johnson Road. | $32,510.00 | PUD Website and Operations Directors office. | |
| 2021-07-25 | Hoch Construction | Install ADA compliant door at Operations Center | $27,811.77 | PUD Website and Operations Directors office. | |
| 2021-08-20 | Titan FB | Install utility poles along the PUD owned transmission line. | $38,185.00 | PUD Website and Operations Directors office. | |
| 2021-03-19 | Tracy's Insulation | Insulate new connex container. | $5,359.84 | PUD Website and Operations Directors office. | |
| 2021-03-10 | Sound Earth Strategies | Provide soils and ground water evaluation on parcel 001333013 | $8,425.00 | PUD Website and Operations Directors office. | |
| 2021-04-29 | D and L Poles | Hoh Fiber Project part 2. Plow fiber from SR101 to Hoh Tribal Buildings. | $36,712.15 | PUD Website and Operations Directors office. | |
| 2021-05-04 | Magnum Power | Hoh Fiber Project part 1. Pull fiber into existing UG conduit, install eight spans OH fiber. | $20,947.20 | PUD Website and Operations Directors office. | |
| 2021-06-02 | Kemp West | Brush Hog with mini excavator. Ground clear under PUD owned OH electrical conductor. | $5,500.00 | PUD Website and Operations Directors office. | |
| 2021-10-27 | Asplundh Tree Expert LLC. | November to December Time and Materials Bid 2021 | $94,644.00 | PUD Website and Operations Directors office. | |
| 2021-12-08 | IDGAF Inc | Van Trojen Road Electrical Upgrade Phase 1. This project was bid out late 2021 this is a 2022 project. | $54,052.50 | PUD Website and Operations Directors office. | |
| 2021-12-08 | IDGAF Inc. | Rhododendron Drive Electrical Undergrounding. This project was bid out late 2021 this is a 2022 project | $61,260.00 | PUD Websit and Operations Directors office | |
| 2021-12-08 | Kemp West | Gardiner Tree Trimming Bid. This project is bid out late 2021 project begins January 6, 2022. | $108,270.00 | PUD Website and Operations Directors office. | |
| 2021-12-08 | D and L Poles | Thorndyke Driveway Project. This project is bid out late 2021 project begins 2022. | $50,500.00 | PUD Website and Operations Directors office. | |
| 2021-12-06 | IDGAF Inc. | Eaglemount Road Tree Clearing Project | $26,296.95 | PUD Website and Operations Directors office. | |
| 2022-03-03 | D and L Poles | PUD Ground Clearing 2022 Project | $27,493.20 | PUD Website and Operations Directors office. | |
| 2022-03-03 | D and L Poles | PUD Port of Port Townsend Marina Electrical Upgrade Project. | $46,000.00 | PUD Website and Operations Directors office. | |
| 2022-03-03 | Fredrickson Electric | 191 Otto Street Lighting Project | $39,868.41 | PUD Website and Operations Directors office. | |
| 2022-02-04 | Kemp West | Dabob/Thorndyke Road Tree Trimming Bid | $128,300.00 | PUD Website and Operations Directors office. | |
| 2022-03-28 | IDGAF | 300 Four Corners Temporary Laydown Yard | $66,136.42 | PUD Website and Operations Directors office. | |
| 2022-08-08 | D and L Poles | On Call Water Services Bid | $337.00 per hour | PUD Website and Operations Directors office. | |
| 2022-08-08 | Asplundh Tree Expert LLC | October to December Time and Materials Project 2022 | $123,531.20 | PUD Website and Operations Directors office. | |
| 2022-10-12 | CHJ and Son Excavating | Van Trojen Road Conduit Realignment Project. | $13,813.15 | PUD Website and Operations Directors office. | |
| 2022-09-19 | IDGAF Inc. | Oak Bay Regulator Trenching and Pad Project | $23,652.33 | PUD Website and Operations Directors office. | |
| 2022-10-12 | Peterson Lake Timber Sale 2023 Work to be conducted in 2023. | PUD Website and Operations Directors office. | |||
| 2022-02-03 | CHJ Excavating Inc. | Irondale Substation Electrical/Fiber Upgrade Project | $53,336.81 | PUD Website and Operations Directors office. | |
| 2022-05-04 | D and L Poles | 14th Street Underground Project | $41,458.00 | PUD Website and Operations Directors office. | |
| 2022-04-10 | ICI Inc. | Cedar Avenue Project | $168,352.21 | PUD Website and Operations Directors office. | |
| 2022-11-22 | Pacific Poles | PUD Utility Pole Testing for 2023. Work will begin in 2023. Cost of $209.19 is cost if all testing options are used. | $209.19 per pole | PUD Website and Operations Directors office. | |
| 2022-11-22 | Cascadia Solar | Install solar PV system on PUD Operations Center at 310 Four Corners Road. This project bid out in 2022 for work to be conducted in 2023 | $239,052.00 | PUD Website and Operations Directors office. | |
| 2022-10-10 | D and L Poles | Loftus Road Electrical Upgrade Project | $13,092.00 | PUD Website and Operations Directors office. | |
| 2022-01-01 | Palouse Power | Dock Crew 2022 Bid for four man crew per hour. | $815.38 | PUD Website and Operations Directors office. | |
| 2022-01-13 | Olympic Electric | PUD BPA to Irondale Substation Fiber Installation | $79,792.79 | PUD Website and Operations Directors office. | |
| 2022-01-03 | Cooperative Response Center | CRC 24-Hour Call Service Charged on a per call basis invoiced per month. | $5,000.00 per mo | PUD Website and Operations Directors office. | |
| 2023-02-07 | Katies Cleaning Service | Clean PUD owned buildings at 310 Four Corners, 210 Four Corners, and 191 Otto Street contract for one year with option to extend | $2,500.00 per mo | PUD Website and Operations Directors office. | |
| 2023-01-03 | Asplundh Tree Expert | Janaury to March Time and Materials 2023 Project. | $128,747.52 | PUD Website and Operations Directors office. | |
| 2023-01-16 | Palouse Power | Electrical Dock Crew ELCON-2023-01 Palouse overall grade for the project was 254 | $2,730,090.00 | PUD Website and Operations Directors office. | |
| 2023-02-23 | Kemp West | PUD Tree Trimming/Removal Time and Materials Bid Summer 2023 | $196,978.10 | PUD Website and Operations Directors office. | |
| 2023-08-09 | D and L Poles | PUD East Quilcene Road Bridge Crossing | $52,368.00 | PUD Website and Operations Directors office. | |
| 2023-05-09 | Northwest Safety LLC | Monthly Safety Training Contract | $17,325.00 | PUD Website and Operations Directors office. | |
| 2023-06-05 | Magnum Power LLC | Oak Bat to Washington Lane | $96,651.69 | PUD Website and Operations Directors office. | |
| 2023-06-27 | Daniel Anderson Trucking | Flagging Support for PUD 2023 | $164,548.33 | PUD Website and Operations Directors office. | |
| 2023-07-03 | Daniel Anderson Trucking | Flagging Summer 2023 | $75,056.44 | PUD Website and Operations Directors office. | |
| 2023-05-01 | Oasis Well Drilling | Gardiner Source Pump and Motor Replacement Project | $29,989.41 | PUD Website and Operations Directors office. | |
| 2023-07-07 | Wright Tree Service | Fiber Electric Tree Trimming Summer 2023 Time and Materials | $189,949.50 | PUD Website and Operations Directors office. | |
| 2023-04-12 | Kemp West | Tree Trimming/Removals Cape George Road. Work to begin January 2, 2024 approximate end date of March 8, 2024 | $142,704.47 | ||
| 2023-07-12 | Asplundh Tree Expert | February to May 2024 Time and Materials. Work to begin February 2, 2024 and end May 31, 2024. | $194,509.24 | ||
| 2023-08-01 | Daniel Anderson Trucking&Excavating | Flagging Support-Summer 2023(Linecrew) | 166,432.41 | 310 Four Corners RD, Port Townsend | |
| 2023-08-01 | Daniel Anderson Trucking&Excavating | Safety Flagging-Summer 2023 (Tree Trim) | 69,631.69 | 310 Four Corners RD, Port Townsend | |
| 2023-08-01 | Kemp West, Inc | Tt T&M-Various Areas W/E 07/29/2023 | 14,910.80 | 310 Four Corners RD, Port Townsend | |
| 2023-08-24 | 2 Grade Llc | Quilcene Fiber Hut Civil Work | 52,337.45 | 310 Four Corners RD, Port Townsend | |
| 2023-09-01 | Magnum Power, Llc | Oak Bay To Washington Lane Project | 102,608.55 | 310 Four Corners RD, Port Townsend | |
| 2023-09-01 | Rognlin'S Inc. | Quilcene Water Tank-Pay App 4 | 77,242.80 | 310 Four Corners RD, Port Townsend | |
| 2023-09-01 | Double D Electrical, Inc | Dc Power Plant Instl - 191 Otto St | 15,189.37 | 310 Four Corners RD, Port Townsend | |
| 2023-09-01 | Double D Electrical, Inc | Removal Of Unused Data Cables - 191 Otto | 12,044.64 | 310 Four Corners RD, Port Townsend | |
| 2023-10-01 | Carl H. Johnson & Son Excavating Llc | Emergency Water Main Repair- 90 Alder St | 12,014.47 | 310 Four Corners RD, Port Townsend | |
| 2023-10-01 | D & L Poles | Septic Mowing-2023-2024-Contract Extend | 11,368.22 | 310 Four Corners RD, Port Townsend | |
| 2023-10-14 | Asplundh Tree Expert Co | Tree Trimming/Removal T&M-Fall 2023 | 115,492.86 | 310 Four Corners RD, Port Townsend | |
| 2023-11-01 | Viking Fence Company | Fencing-Quilcene Fiber Hut-Pryor | 22,957.91 | 310 Four Corners RD, Port Townsend | |
| 2023-11-13 | Pacific Pole Inspection, Llc | Pole Testing 2023-Inv# 1426 | 13,280.74 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Rognlin'S Inc. | Quilcene Water Tank-Pay App# 6 | 72,082.80 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Double D Electrical, Inc | Quilcene Fiber Hut-Electrical Work | 60,672.30 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Seton Construction Inc | Flagging - Various Locations 6/26-7/27 | 28,875.45 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Seton Construction Inc | Flagging - Souht Point Road/Coyle | 19,961.89 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Olympic Electric Co, Inc | Emgr Cblfault - 13691 Center Rd 12/31/22 | 12,375.21 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Double D Electrical, Inc | Conduit Raceway - Fiber Cables - Otto St | 11,577.69 | 310 Four Corners RD, Port Townsend | |
| 2023-12-01 | Seton Construction Inc | Flagging - East Quilcene 6/12-6/22/2023 | 10,466.70 | 310 Four Corners RD, Port Townsend | |
| 2023-12-02 | Carl H. Johnson & Son Excavating Llc | Conduit Install - Oak Bay & Flagler 12/2 | 12,794.16 | 310 Four Corners RD, Port Townsend | |
| 2023-12-20 | D & L Poles | East Quilcene Bridge Crossing Fiber Prjt | 95,020.65 | 310 Four Corners RD, Port Townsend | |
| 2023-12-21 | Idgaf, Inc | Van Trojen Rd Phase 1 Upgrade | 122,324.03 | 310 Four Corners RD, Port Townsend | |
| 2023-12-25 | Rognlin'S Inc. | Quilcene Water Tank-Pay App# 7 | 129,458.06 | 310 Four Corners RD, Port Townsend | |
| 2024-01-03 | Katies Cleaning Service | Janitorial Services-2023/2024 | 18,128.41 | 310 Four Corners RD, Port Townsend | |
| 2024-01-06 | Kemp West, Inc | Tt T&M-Cape Goerge | 60,714.10 | 310 Four Corners RD, Port Townsend | |
| 2024-01-08 | Double D Electrical, Inc | Quilcene Fiber Hut-Electrical Work | 30,624.38 | 310 Four Corners RD, Port Townsend | |
| 2024-01-09 | Air Systems Engineering Inc Total | Hvac Maint-310 Four Corners Rd,2022-2024 | 22,813.80 | 310 Four Corners RD, Port Townsend | |
| 2024-01-09 | Daniel Anderson Trucking&Excavating | Flagging - 291 Olympus Blvd 1/9/24 | 10,078.97 | 310 Four Corners RD, Port Townsend | |
| 2024-02-01 | Advanced Timber Resources | Burning Slash Piles- Peterson Lake | 29,974.68 | 310 Four Corners RD, Port Townsend | |
| 2024-02-02 | Daniel Anderson Trucking&Excavating | Flagging For Kemp West | 75,540.90 | 310 Four Corners RD, Port Townsend | |
| 2024-02-03 | Asplundh Tree Expert Co | Tree Trimming T&M-February-May 2024 | 213,746.84 | 310 Four Corners RD, Port Townsend | |
| 2024-02-03 | Kemp West, Inc | Tt T&M- Quilcene W/E 02/03/2024 | 11,333.85 | 310 Four Corners RD, Port Townsend | |
| 2024-02-21 | Daniel Anderson Trucking&Excavating | Vactra Truck/Labor - 276664 Hwy 101 2/21 | 10,517.24 | 310 Four Corners RD, Port Townsend | |
| 2024-03-01 | Precision Fiber, Inc | Olympic Cooridor/Inbetween Ponb Splicing | 111,745.68 | 310 Four Corners RD, Port Townsend | |
| 2024-03-01 | Seton Construction Inc | Flagging For Kemp West & Asplundh | 28,670.52 | 310 Four Corners RD, Port Townsend | |
| 2024-03-01 | Rce Traffic Control, Inc | Flagging - South Point Rd | 24,703.01 | 310 Four Corners RD, Port Townsend | |
| 2024-03-20 | D & L Poles | Bore Conduits For New Pwr- South Harbor | 17,739.66 | 310 Four Corners RD, Port Townsend | |
| 2024-03-25 | Daniel Anderson Trucking&Excavating | Emergency Water Break - Coyle 3/25/24 | 10,168.12 | 310 Four Corners RD, Port Townsend | |
| 2024-03-28 | Kemp West, Inc | Tree Trimming/Removals Cape George Rd | 142,704.47 | 310 Four Corners RD, Port Townsend | |
| 2024-04-01 | D & L Poles | Quilcene Substation Bore | 146,217.13 | 310 Four Corners RD, Port Townsend | |
| 2024-04-01 | Shold Excavating Inc | 430 Point Hudson Urd Upgrade | 30,549.09 | 310 Four Corners RD, Port Townsend | |
| 2024-04-11 | Seton Construction Inc | Snow Creek Well House Replacement | 149,253.79 | 310 Four Corners RD, Port Townsend | |
| 2024-04-19 | Carl H. Johnson & Son Excavating Llc | Flagging For Tree Trimming | 31,153.43 | 310 Four Corners RD, Port Townsend | |
| 2024-05-01 | Advanced Timber Resources | Remove Hazard Trees & Brush - 21 Kennedy | 32,195.41 | 310 Four Corners RD, Port Townsend | |
| 2024-05-02 | Emerald Excavation Llc | Install Conduit- Taft St 5/1-2/24 | 22,645.80 | 310 Four Corners RD, Port Townsend | |
| 2024-05-02 | Advanced Timber Resources | Peterson Lake Replanting Trees | 11,661.70 | 310 Four Corners RD, Port Townsend | |
| 2024-06-08 | Kemp West, Inc | Tt T&M- Fiber | 79,945.90 | 310 Four Corners RD, Port Townsend | |
| 2024-06-11 | Advanced Timber Resources | Brush Hog - Various Locations | 28,016.88 | 310 Four Corners RD, Port Townsend | |
| 2024-06-13 | Advanced Timber Resources | Chip Files Of Debris From Prev Logging | 31,911.75 | 310 Four Corners RD, Port Townsend | |
| 2024-06-24 | Olympic Electric Co, Inc | Discovery Rd Streetlight Installation | 36,317.21 | 310 Four Corners RD, Port Townsend | |
| 2024-06-29 | Van Ness Construction Llc | Oh/Urd Conversion-Shorts Lane | 22,308.77 | 310 Four Corners RD, Port Townsend | |
| 2024-06-30 | D & L Poles | Lead Service Line Inventory-Water/Abbott | 43,754.53 | 310 Four Corners RD, Port Townsend | |
| 2024-07-01 | D & L Poles | Septic Mowing-2023-2024-Contract Extend | 22,142.56 | 310 Four Corners RD, Port Townsend | |
| 2024-07-11 | D & L Poles | Mowing W/Excavator- Chimacum Crk 7/11/24 | 10,604.52 | 310 Four Corners RD, Port Townsend | |
| 2024-07-13 | Kemp West, Inc | Tt T&M- Fiber | 35,319.85 | 310 Four Corners RD, Port Townsend | |
| 2024-08-01 | D & L Poles | Mowing - Various Locations | 26,572.40 | 310 Four Corners RD, Port Townsend | |
| 2024-08-01 | Carl H. Johnson & Son Excavating Llc | Emergency Water Repair - 70 Madrona 7/29 | 11,221.15 | 310 Four Corners RD, Port Townsend | |
| 2024-08-06 | Daniel Anderson Trucking&Excavating | On Call Flagging Support-Olympic Fiber | 87,009.02 | 310 Four Corners RD, Port Townsend | |
| 2024-08-08 | Advanced Timber Resources | Brush Hog For Fiber Install | 18,388.81 | 310 Four Corners RD, Port Townsend | |
| 2024-08-15 | Rce Traffic Control, Inc | Flagging - Tree Trimming | 45,278.36 | 310 Four Corners RD, Port Townsend | |
| 2024-08-15 | Burwash And Sons, Inc | Claybanks Conduit/Vault Installation | 25,651.72 | 310 Four Corners RD, Port Townsend | |
| 2024-08-17 | Kemp West, Inc | Tt T&M- Fiber | 191,889.90 | 310 Four Corners RD, Port Townsend | |
| 2024-08-20 | Idgaf, Inc | Brush Hog For Fiber Install 08/13-08/20 | 28,829.68 | 310 Four Corners RD, Port Townsend | |
| 2024-09-01 | Asplundh Tree Expert Co | Tt Removal For Fiber Install | 59,730.06 | 310 Four Corners RD, Port Townsend | |
| 2024-09-01 | Shold Excavating Inc | Remove Trailer & Fix Parking Area - 193 | 19,587.81 | 310 Four Corners RD, Port Townsend | |
| 2024-09-16 | D & L Poles | Brush Hog Various Locations - 9/16/24 | 26,478.57 | 310 Four Corners RD, Port Townsend | |
| 2024-09-21 | National Metering & Technical Services | Ami Metering Installation-Pay App 1 | 82,361.77 | 310 Four Corners RD, Port Townsend | |
| 2024-10-01 | D & L Poles | Brush Hogging-Fiber Under Dg03203 | 111,412.92 | 310 Four Corners RD, Port Townsend | |
| 2024-10-01 | D & L Poles | Excavation - 71 Southport Ln 7/30/2024 | 17,881.49 | 310 Four Corners RD, Port Townsend | |
| 2024-10-01 | D & L Poles | Bore Conduit - 2155 Discovery Rd 9/10/24 | 12,653.96 | 310 Four Corners RD, Port Townsend | |
| 2024-10-01 | D & L Poles | Bore Conduit - 126 Goliah Ln | 11,039.83 | 310 Four Corners RD, Port Townsend | |
| 2024-10-04 | National Metering & Technical Services | Ami Metering Installation-Pay App 2 | 55,405.34 | 310 Four Corners RD, Port Townsend | |
| 2024-10-09 | Kemp West, Inc | Upper Cape George Tree Trimming Prjct | 110,800.00 | 310 Four Corners RD, Port Townsend | |
| 2024-10-23 | National Metering & Technical Services | Ami Metering Installation-Pay App 3 | 64,150.80 | 310 Four Corners RD, Port Townsend | |
| 2024-10-25 | Kemp West, Inc | Tree Trimming Fall 2024 | 177,571.30 | 310 Four Corners RD, Port Townsend | |
| 2024-11-01 | Emerald Excavation Llc | Tyler Street Oh/Urd Project | 106,681.41 | 310 Four Corners RD, Port Townsend | |
| 2024-11-01 | Van Ness Construction Llc | Kens Way Conduit/Vault Install Project | 55,887.73 | 310 Four Corners RD, Port Townsend | |
| 2024-11-01 | National Metering & Technical Services | Ami Metering Installation-Metering-Pay 4 | 47,707.25 | 310 Four Corners RD, Port Townsend | |
| 2024-11-19 | Shold Excavating Inc | Discovery Ridge - Drainfield Repairs | 70,674.98 | 310 Four Corners RD, Port Townsend | |
| 2024-11-20 | National Metering & Technical Services | Ami Metering Installation-Metering-Pay 5 | 24,979.54 | 310 Four Corners RD, Port Townsend | |
| 2024-12-02 | National Metering & Technical Services | Ami Metering Installation-Metering-Pay#6 | 21,261.41 | 310 Four Corners RD, Port Townsend | |
| 2024-12-18 | National Metering & Technical Services | Ami Metering Installation-Metering-Pay#7 | 23,251.39 | 310 Four Corners RD, Port Townsend | |
| 2025-02-01 | D & L Poles | Bore Nip Lee Rd W/ Conduit For Ug Faults | 10,997.28 | 310 Four Corners RD, Port Townsend | |
| 2025-02-09 | D & L Poles | Place Conduit - Nip Lee Rd | 10,920.91 | 310 Four Corners RD, Port Townsend | |
| 2025-02-15 | Asplundh Tree Expert Co | Tree Trimming January-April 2025 | 145,445.75 | 310 Four Corners RD, Port Townsend | |
| 2025-03-01 | D & L Poles | Move Conduit - 4910 49Th St | 10,097.62 | 310 Four Corners RD, Port Townsend | |
| 2025-03-02 | A. Millican Crane Service Inc | Transport Regulators - Hastings Sub | 11,902.72 | 310 Four Corners RD, Port Townsend | |
| 2025-04-14 | Excel Utility Construction | Madrona Ridge Phase 1 | 42,260.98 | 310 Four Corners RD, Port Townsend | |
| 2025-05-01 | Idgaf, Inc | 2025 Mowing Transmission-Bancroft | 40,084.04 | 310 Four Corners RD, Port Townsend | |
| 2025-05-01 | D & L Poles | Mowing Of Transmission Lines | 11,019.10 | 310 Four Corners RD, Port Townsend | |
| 2025-05-20 | A. Millican Crane Service Inc Total | Crane Services-Quilcene/Disco Bay Subs | 60,562.32 | 310 Four Corners RD, Port Townsend | |
| 2025-05-28 | Xylem I Llc | Tree Trimming-Fiber | 43,438.40 | 310 Four Corners RD, Port Townsend | |
| 2025-06-01 | Apex Mechanical,Llc | Ev Charger Installation-Operations | 28,009.80 | 310 Four Corners RD, Port Townsend | |
| 2025-06-14 | D & L Poles | Mowing Drainfields 06/14/25 | 11,049.95 | 310 Four Corners RD, Port Townsend | |
| 2025-06-20 | A. Millican Crane Service Inc | Unload & Set Transformer - Pl Substation | 10,161.07 | 310 Four Corners RD, Port Townsend | |
| 2025-06-23 | Van Ness Construction Llc | Van Trojen Conduit Replacement-Phase2 | 115,082.93 | 310 Four Corners RD, Port Townsend | |
| 2025-07-01 | D & L Poles | Emergency Call Out - 231 Kincaid6/10 | 27,037.92 | 310 Four Corners RD, Port Townsend | |
| 2025-07-01 | D & L Poles | Mowing Trans Lines - 6/9, 6/17 & 6/24 | 11,034.66 | 310 Four Corners RD, Port Townsend | |
| 2025-08-01 | Asplundh Tree Expert Co | Tree Trimming-Summer 2025 | 30,848.35 | 310 Four Corners RD, Port Townsend | |
| 2025-08-05 | Carl H. Johnson & Son Excavating Llc | Emergency Water Main Repair - Lillian St | 13,237.77 | 310 Four Corners RD, Port Townsend | |
| 2025-08-06 | Carl H. Johnson & Son Excavating Llc | Flagging - Egg & I 08/12-08/15 | 13,278.72 | 310 Four Corners RD, Port Townsend | |
| 2025-08-09 | D & L Poles | Mowing Drainfields 08/09/253 | 11,180.99 | 310 Four Corners RD, Port Townsend |